Background

A packaging room producing 25 million pounds a year was leaving savings on the table.

The client, a frozen foods co-manufacturer, retained Saphineia for an 18-week engagement to improve labor productivity and reduce scrap in its main packaging room, which produced roughly 25 million pounds of finished goods a year. Saphineia guaranteed the client a 6-month payback on its fees, with any gains sustained above the target shared between the client and Saphineia for 12 months following project completion.

No Daily Management Cadence

No hour-by-hour boards, daily accountability meetings, or CAPA process to catch issues in real time

Unaddressed Line Constraints

Equipment and process bottlenecks capping packaging line throughput had gone unidentified

Shop Floor Leadership Gap

Production Manager and supervisors lacked the habits of high-performing floor leaders

Uncontrolled Overfill & Scrap

MAV rules and quality specs weren’t being enforced, driving up cost per pound

ss-img-1
Saphineia CI Project - Monthly Realized Improvement
BagRoomOEEWeightedAverages
Action

Saphineia embedded on the shop floor to establish a daily discipline of measurement and accountability.

  • Implemented daily management routines, including hour-by-hour production boards and accountability meetings.
  • Identified equipment and process constraints limiting packaging line throughput.
  • Built KPIs, CAPA tracking, SOCs, and SOPs to sustain operational improvements.
  • Reduced overfill and scrap by reinforcing MAV rules and quality specifications.
  • Coached shop floor leaders to strengthen accountability and sustain new routines.

30 %

Reduction in cost per pound

88 %

OEE, up from 76% in 4 months

Results

In four months, daily measurement and accountability turned into real cost savings.

Monthly productivity improved to $0.029 per pound in September, ramped up to a peak of $0.044 per pound in October, and finally settled at $0.031 per pound in November, with each figure well above the $0.011 per pound target versus the first-half baseline.

Bag Room OEE climbed from a 76% weighted average in the first half of the year to 88% by December.

Combined with reduced overfill and a substantial cut in scrap, these gains drove an approximate 30% reduction in cost per pound, and left the client’s team owning a culture of measurement and accountability on the shop floor

Quote

Saphineia did an excellent job recognizing common operational challenges while still appreciating what makes our business unique. People felt heard, no feedback was dismissed, and the team consistently approached problems as allies on the same side of the table.

CEO of Saphineia Client
Quote

“Critically, Saphineia engaged respectfully with our team, who felt Saphineia understood the challenges they face day-to-day and enabled them to better meet the expectations of our owners. Saphineia knows the Private Equity business and what our sponsors expected.”

CEO, Contract Manufacturer
Start the conversation

Ready to Strengthen Your Operations?

Whether you’re preparing for an exit, evaluating an acquisition, or looking to improve operations, we’d welcome a conversation.

Every conversation starts and ends with a food & beverage operator, never an account manager.