Background

A three-company, $1.5 billion consolidation needed one partner across the entire deal, not just the diligence phase.

A PE firm acquired three fresh produce processors to create a $1.5 billion manufacturer spanning 12 facilities nationwide. Saphineia supported every phase of the transaction, from initial operational diligence through detailed integration planning and post-acquisition execution support and synergy capture, including facility closures and associated equipment moves.

Deal Scale

PE firm consolidating three fresh produce processors into a single $1.5 billion manufacturer spanning 12 facilities nationwide

Full Lifecycle Need

Newco needed support across the entire transaction lifecycle, from diligence through post-close execution, not just a single phase

Original Plan Carried Risk

Initial consolidation approach (Plan A) carried more capital spend and less synergy than an achievable alternative

Execution Complexity

Realizing synergies required coordinating facility closures, plant redesigns, equipment relocations, line startups, and SKU transitions across the network

shutterstock_2461804463-scaled
capital_synergy_cash_flow_plans
Action

Saphineia stayed embedded from diligence through execution, turning the integration strategy into a coordinated consolidation program.

  • Conducted a 13-week operational diligence across capacity, consolidation feasibility, and synergies.
  • Built the integration framework for governance, risk management, and execution.
  • Developed 100-day and 12-month consolidation plans with risk mitigation strategies.
  • Identified a lower-risk, lower-capex network plan with greater synergy potential.
  • Served as the integration PMO through facility closures and network changes.
  • Coordinated plant redesigns, equipment moves, line startups, and SKU transitions.

$1.5 B

Size of manufacturer created from a 3-company consolidation

2

Facilities closed, on time and on budget

Results

The consolidation delivered on time, on budget, and with real synergies already realized.

Saphineia’s execution support closed 2 facilities, relocated or modified 27 manufacturing lines, and transitioned 266 SKUs to remaining facilities — all managed within a capex budget of approximately $7.5 million, on time and on budget.

Equipment movement, capital installations, SKU transitions, and target facility closures were all completed on time and on budget. Through July 2026, the consolidation had achieved $3.0 million in net synergies, with the network optimization plan continuing to drive toward the larger opportunity identified during diligence.

Quote

Saphineia did an excellent job recognizing common operational challenges while still appreciating what makes our business unique. People felt heard, no feedback was dismissed, and the team consistently approached problems as allies on the same side of the table.

CEO of Saphineia Client
Quote

Saphineia worked seamlessly alongside our other advisors and helped us avoid several potential pitfalls. Their insight was particularly valuable in identifying operational risks with the target and guiding us through TSA and ESA considerations. The value they brought especially in risk identification and pre-planning was clear at every step.  They also helped us recognize internal capability gaps that needed to be addressed as we prepared for integration.”

CFO, Saphineia Client
Start the conversation

Ready to Strengthen Your Operations?

Whether you’re preparing for an exit, evaluating an acquisition, or looking to improve operations, we’d welcome a conversation.

Every conversation starts and ends with a food & beverage operator, never an account manager.