Every conversation starts and ends with a food & beverage operator, never an account manager.
Two years of declining OEE, and the fix was sitting in people’s heads instead of the CMMS.
The dairy plant had experienced OEE declines across all lines from 2022 to 2024. The site had significant maintenance subject matter expertise, but most of that knowledge was never documented in its CMMS system: equipment rebuilds and PMs hadn’t improved performance, and the PMs themselves lacked centerlines, pictures, and detail. Maintenance techs struggled to perform PMs properly and completely even after training, and PMs weren’t scheduled based on the time realistically available with production.
Plant had experienced OEE declines across all lines from 2022 to 2024
Site had significant maintenance know-how, but most of it was never captured in the CMMS system
Equipment rebuilds and PMs hadn’t improved performance, and PMs lacked centerlines, pictures, and detail
PMs weren’t scheduled based on time actually available with production, and techs struggled to complete them even after training
Saphineia captured the maintenance expertise already on staff and put it where technicians could actually use it.
- Reviewed OEM manuals to capture recommended preventive maintenance requirements.
- Documented SME knowledge with detailed instructions, centerlines, and pictures.
- Added missing PMs and optimized frequencies to reduce downtime and unnecessary parts usage.
- Corrected PM completion times to improve scheduling with production.
- Uploaded complete PM documentation into the CMMS for technician use.
47 → 59 %
Average OEE across all lines, 2024 to 2025
60 → 90 % +
PM completion rate
3 X
Increase in PM documentation detail in the CMMS
Two years of declining OEE turned into a double-digit gain within one project.
OEE performance improved from an average of 47% across all lines in 2024 to an average of 59% in 2025 at the end of the project, while PM completion improved from roughly 60% to over 90%. PM detail in the CMMS increased by more than 300%, three times the number of instructions.
The team also received detailed spare parts lists for all equipment, improving spare parts overhead cost and ensuring critical spare parts stayed stocked, and helped establish a maintenance and operations scheduling meeting going forward.